Get In Touch: 01235 634744

The Four Quarters Team Challenge

Enquire Now

Looking for a way to break the ice? Try our Four Quarters Team Challenge!

Locations

Mobile – Nationwide

Duration

2-2.5 Hours

Participants

10+ people

Description

In our Four Quarters Team Challenge, creativity and collaboration come together to create a fun, less competitive team building event.

Your teams rotate around the four-team challenge zones, spending up to thirty mins at each zone. The aim is to work collaboratively to create a final product at the end of each challenge zone.

Team Challenge 1 – Canvas Art

Each team is presented with a giant canvas and acrylic paints. The team must then work together to create a section of the overall design.

Four Quarters Team Challenge Art

Team Challenge 2 – The Egg Basket

Teams will all be given a budget and must purchase materials at our materials shop. Once you have selected your materials, teams must create an egg basket which can protect an uncooked egg from breaking when we drop it from height! You can even decorate your egg, too, if you choose!

At the end of the event, all egg baskets will be dropped. Whichever team protects their eggs the best will win. You have one chance only…..

Four Quarters Team Challenge Egg Basket

Team Challenge 3 – Music Mania

Each team films a version of a music video using the tablets we provided. Fancy dress and props are provided so you can either make something spectacular or hilarious! You will have the choice to choose your song:

  • Mamma Mia – ABBA
  • Wannabe – Spice Girls
  • The Lazy Song – Bruno Mars

After the event, you will receive a full edited video of your teams efforts (this will be sent in the days after the event as soon as we can).

Four Quarters Team Challenge Art

Team Challenge 4 – Think Outside The Box

We give you thousands of LEGO bricks and free reign to build whatever you like. Some teams choose their company logo; others prefer something more abstract. The result is LEGO on a massive scale.

Four Quarters Team Challenge Lego

For the finale, the teams come together for a grand unveiling. They will see their completed Da Vinci Masterpieces, watch as their eggs drop, laugh at the brilliance of their videos and enjoy their completed LEGO Sculptures.

Do you have what it takes to master each quarter and create something fantastic with your team? Give it a go!

 

This event is perfect for companies that want to base an event around their values.

If you have a specific theme in mind then let us know – we will create a team challenge based on your company each quarter.

You may also enjoy The Office Games or our Quickfire experience!

 

Optional Upgrades

Please state these in your enquiry comments:

  • Venue finding – POA
  • Meeting room – before/after the event – POA
  • Accommodation – POA
  • Refreshments – POA

What Are the Benefits of this Experience?

  • Working in smaller groups
  • Morale boosting
  • Leadership skills
  • Collaboration
  • Communication
  • Challenges
  • Thinking skills
  • Planning your strategy

Space / Venue Requirements

  • An indoor room with ample space for all participants
  • We will need to set out four designated areas, ideally with tables and chairs that groups can gather around
  • Event team will require 90 minutes before and after event for set up / pack down
  • Parking on site will be required or a loading bay

Included in the Experience

  • All required props & equipment
  • Full Event Management
  • Fun event guaranteed
  • Professional events team
  • Speaker
  • Microphone

Important Information

  • Activity is available UK wide
  • Indoor only team experience
  • Time may vary depending on group size, but the event will last for approximately 2-2.5 hours
  • It is a requirement that parking is provided for us
  • Price dependent on group size, location, date, enquire for more details

Booking and Cancellation Terms

Full payment is required upon booking. If you then choose to cancel your event, your entitlement to a refund depends on the amount of notice you give us.

  • More than 52 weeks 100%
  • From 13 up to and including 52 weeks 75%
  • From 43 days up to and including 12 weeks 50%
  • From zero business days up to and including 42 business days 0% (no refund of Charges)

Promotional Video

The Four Quarters Team Challenge

Enquire for The Four Quarters Team Challenge

FAQs

How far in advance do we need to book?

To put it simply, as far in advance as possible. We do have a limited number of set-ups meaning we can only perform so many each day in each location. Get in touch as soon as you are ready to book!

What size groups can be catered for?

All group sizes are welcome but we recommend groups of 16+ people (4 people per quarter minimum)

Can I make this activity be based around our company values?

Yes! We will be able to make activities be centred around your specific themes if you choose!

The Latest from Our Blog

Enquire Now